 Checklist for Shuttering / Formwork





SHUTTERING: (Material Inspection ,Staging & Erection)

  • check Architectural/R.C.C. Details as per drawings.
  • check method statement approved as per companies standard
  • Check for design of shuttering/shuttering scheme

1. Plywood Surface:

-   Pilled off

-  Mould Oil Applied

-  Holes/Gaps Sealed

-     Cleanliness

-     Edges damaged

-  Warp age

2. STEEL

-wall form panels

-corner angles

-jacks

-base plates

-clamps & couplers

- channels, clips, pipes

3. Formwork Alignment, formwork level

4. Verticality

5. Form Ties In Position

6. Form Ties Fastened

7. Bracing In Position

8. Rigidity Of Joints Between Panels

9. Timber Members In Good Condition

10. Steel Members Properly Welded/Bolted

11. Member Sizes And Positions According To Design.(Walers, Studs, Plates, wall plates, bolts etc)

12. Scaffolding/Props/Spans

13. Construction/Expansion Joint Details

14. Holes for Electrical Conduits/ Dowels etc.

15. Openings For Services

16. Tolerances in mm

17. Spacing of props

18. Spacing of Spans

19. Check  for Readiness of shutter forms for  Release to fix reinforcement

20. Has the consultant inspected the formwork before concreting

21. Stripping time/date


Deshuttering points

1. Check whether concrete quality is free from defects after de-shuttering

2. Check condition of various parts of shuttering assembly 

3. Are repairs carried out to damaged plates and other components of shuttering assembly

4. Clean ,oil and stack shuttering material for future use